24014 The Salvation Army Labor Temple Demo
The scope of the project is defined by the Contract Documents and consists of the removal of the existing (5) five story, load bearing clay masonry structure located at 400 NE Jefferson in its entirety including the basement and foundations. The work also includes site work associated with the removal of the building. The site work is compromised of, but not limited to, erosion control, sidewalk removal and replacement, pavement removal, utility removal/cap, earthwork/grading, and seeding.
Addendum 1
(click to expand/collapse)
Name | Size | ||
24014 009101 AD1 | 2.2 MB |