Limestone Community High School CHSD 310 RTU AND EXHAUST FAN REPLACEMENT

The scope of the Project is defined by the Contract Documents and generally consists of but not limited to a roof recovery of an existing built up asphalt roof with a single ply membrane roof with associated accessories, flashing, and trims. Limited mechanical and electrical work for roof top equipment, exhaust fans, and penetrations is expected to facilitate roof recovery.

Status

Accepting Bids

Prebid Date 11/6/24 10:00am
Bid Date 11/13/24 2:00pm

Company & Contacts

Keach Architectural Design
Lee Gerriets  
(309) 263-4545

Location

4201 Airport Road, Bartonville, IL 61607

A “Pre-Bid” Meeting and guided jobsite tour is scheduled to begin Wednesday, November 6th, 2024 @ 10:00 AM prevailing time, at the Limestone Community High School, 4201 Airport Road, Bartonville, IL 61607. The Architect and the Owner will not respond to questions orally regarding the Project outside of the Pre-Bid Meeting. All requests for clarifications or interpretations outside of the Pre-Bid Meeting shall be made in writing and will be answered by Addendum when appropriate

Bids which are mailed or delivered prior to the bid opening should be placed in a sealed envelope and clearly labeled “BID FOR LIMESTONE COMMUNITY HIGH SCHOOL CHSD 310 RTU AND EXHAUST FAN REPLACEMENT" and should be addressed to Keith Brown at the Owner’s above listed address. Bids that are received after the stated time will not be accepted and will be returned unopened.