Limestone Community High School CHSD 310 Roof Replacement

The scope of the Project is defined by the Contract Documents and generally consists of but not limited to a roof recovery of an existing built up asphalt roof with a single ply membrane roof with associated accessories, flashing, and trims. Limited mechanical and electrical work for roof top equipment, exhaust fans, and penetrations is expected to facilitate roof recovery.

Status

Bidding Closed

Prebid Date 11/6/24 10:00am
Bid Date 11/13/24 2:00pm

Company & Contacts

Keach Architectural Design
Lee Gerriets  
3092634545

Location

4201 Airport Road, Bartonville, IL 61607

A “Pre-Bid” Meeting and guided jobsite tour is scheduled to begin Wednesday, November 6th, 2024 @ 10:00 AM prevailing time, at the Limestone Community High School, 4201 Airport Road, Bartonville, IL 61607. The Architect and the Owner will not respond to questions orally regarding the Project outside of the Pre-Bid Meeting. All requests for clarifications or interpretations outside of the Pre-Bid Meeting shall be made in writing and will be answered by Addendum when appropriate.

Every bid shall consist of two (2) fully completed copies of the Bid Form Documents and shall be accompanied by a bid guarantee consisting of bid bond, certified check or cashier’s check made payable to LIMESTONE COMMUNITY HIGH SCHOOL CHSD 310, in amount of five percent of total bid amount. Failure of bidder to submit an acceptable bid bond, certified check or cashier’s check in amount to cover proposals bid upon is cause for rejection of his bid.